Drop-in session for new fibre broadband provider in Brixton Hill

A new telecoms provider, G.Network, is planning to install new fibre broadband throughout Lambeth in 2020, starting with Coldharbour and Brixton Hill. In Brixton Hill, it says, only 8.6% of residents can access upgraded “full fibre” connections and improving this infrastructure locally is a priority for us.

As part of this expansion plan, G.Network are hosting a drop in event next Tuesday, 3 March between 12pm and 8pm at Lambeth Town Hall for residents and businesses.

At the event G.Network will be sharing the current upgrade plans for each ward as well as answering any questions around the installation process.

Drop in event hosted on the 3rd March between 12pm and 8pm at Lambeth Town Hall, Brixton, London, SW2 1RW – no need to book.

What can I expect at the event?

  1. Find out more about the installation process and when this will be coming to your street.
  2. Understand more about full fibre broadband and the differences between full fibre and existing copper cabling.
  3. Register your interest with G.Network so that you can be kept up to date with the roll out plans.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.